Scott Stadium Expansion Update

Story Links

July 7, 2000

Scott Stadium Expansion Photo Gallery

CONSTRUCTION PROGRESS
During June we saw the completion of all of the structural elements of theproject from the North Wings to the Parking Garage. Also, the HVAC, water,sprinkler, fire alarm and lighting systems were continuing in all spaceswith finish work now being the major effort throughout the interior spaces.

The site work, including the fencing and gate structures, is nearingcompletion and some of the landscaping preparation work and ground coverwill commence in July. The major portion of the landscaping will not beinstalled until the weather cools down in the fall. Some will be in placefor the last home game on 18 November.

STADIUM STATISTICS
There has been a significant increase in the amount of questions beingasked about the Project and what new facilities will be included for theopening this September. Many of these questions have been asked during thevarious tours on site so this UPDATE contains some of the statistics we areasked about most often. Also included are some construction facts whichmay be of interest to those in the Engineering, Architectural orConstruction fields.

PROJECT FACTS
STADIUM

 Old NewTotal Capacity 45,000 61,500Luxury Suites 0 44President's Box Seats 132 360President's Box Lounge 2,500 sq. ft. 8,000 sq. ft.Press Box 3,500 sq. ft. 8,000 sq. ft.Press Box (Working Press)70 Positions 128 PositionsConcession stands 8 25Women's Toilets 100 461Men's Toilets 184 414Field Light Towers 120 ft high 180 ft. highTelevision sets 20 232

BRYANT HALL

 Old NewTotal Sq. Ft. 30,000 60,000Home team locker room 1,703 sq. ft. 3,630 sq. ft.Visitor locker room 1,273 sq. ft. 1,750 sq. ft.New Football museum 0 3,800 sq. ft.

(Bryant Hall Level II)

Bryant Hall Level II (Occupants) Ticketing, VSAF, Development, Tutoring, Marketing, Career Services, Recruit Dining Area, Alumni Room.

PERGOLA (pur’ga-la)

72 columns each weighing 18,000 pounds
18 feet high
144,000 brick pavers in the plaza

SUITES

44 South End Zone
8 @750 Sq. Ft., 20 seats
36 @675 Sq. Ft., 16 seats

PARKING GARAGE

600 Parking spaces (net gain of 250)
3 Levels of parking
456 Pieces of structural precast concrete
62 Caissons supporting garage structure

LANDSCAPING

54,054 Trees, shrubs, and ground cover plants

PROJECT CONSTRUCTION FACTS

760,000 bricks 127,000 concrete blocks 8,500 yards of precast concrete 22,500 yards of cast in place concrete 49 miles of telephone wire 25 miles of electrical wire 760,000 individual LED’s (small light bulbs) in HooVisionscreen 172 caissons support new stadium (some as deep as 70 feet) Over 1000 pieces of new furniture Over 1,000,000 man hours on the job by September 2000 $86 million total cost for project

OTHER INTERESTING FACTS

The first monthly edition of the Facilities Management Update wasdistributed to 16 interested parties. The continuing requests for copieshas taken the distribution to its current level of 330 copies per month. The trailer compound where the UVA/CM/A&E staffs (Directorate) arelocated has been the hub of all project administrative activities. By 2September 2000, over 1180 formal meetings, including programming, design,contract, finance, and construction meetings ranging from 30 minutes to7-1/2 hours will have been held in the conference rooms.